6. There are four fixed holes in the machine, can fix the machine on ground by
3
/
4 X
4
3
/
4
anchor bolts. See Fig.23
. MAINTENANCE SCHEDULE
Monthly:
1. Maintance all the running friction parts with grease˗Fig.24
2.
Check all the joint,bolt or pin to make sure good connection.
3.
Visual check if all the hydraulic holes are weared and leaking.
Every six months:
1. Visual check the posibility wared, interference and damaged of all the running parts.
2. Check and fasten if the fastener parts are loosened.
Fig.23

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas LR10 and is the answer not in the manual?

Atlas LR10 Specifications

General IconGeneral
BrandAtlas
ModelLR10
CategoryLifting Systems
LanguageEnglish

Related product manuals