EasyManua.ls Logo

Atronic e-motion - Button Panel Layouts

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
April 2008
e-motion™ Installation
MACHINE INSTALLATION
MACHINE INSTALLATION - OVERVIEW
This section should only be carried out by
Qualified Technical Service Personnel.
Review the list below and perform as needed.
Explanations are located on the following pages and
in additional manuals.
Inspect the machines for transport damage. Any
transport damage should be noted and witnessed
by the freight forwarder. The manufacturer accepts
no responsibility for transport damage.
Check the machines for correct software and
hardware configuration. Check that all EPROMs are
correctly seated on the boards.
Prepare the machine bases by drilling the mounting
holes. Use the Atronic drilling template for proper
mounting hole placement.
Place and mount the machine to the base, using
the Atronic Installation Station (AIS). The power
cable must be inside the cabinet.
Replace shipping locks with casino specific locks.
Install and connect accounting system components.
Check that all internal and external connections
are seated correctly.
Prepare coin acceptor and hopper.
Apply power to the machine.
Load paper into the Printer.
Execute basic machine setup (Initial Setup)
Configure game.
Test bill and coin handling.
Note:
Depending on machine
configuration or jurisdictional
requirements, additional tasks
may have to be carried out
before the machine can be put
into operation (e.g. acceptance
inspection, logicbox sealing,
etc.).

Other manuals for Atronic e-motion

Related product manuals