EasyManua.ls Logo

Aurora T700 - Top Fairing Brackets Installation

Aurora T700
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
The top fairing brackets
are mounted on the tower
using a black spacer and an
anti-vibration
dampener.
Put the spacer on top (green
circle) and the a/v
dampener on the bottom
(red circle).
Do not use thread lock.
Repeat the procedure
on the other side.
Torque value for
all nuts and bolts: 10Nm
11. TOP FAIRING BRACKETS INSTALLATION