EasyManua.ls Logo

AutomationDirect CLICK C0-12ARE-1-D - Installing the CLICK PLC; Connecting the Modules Together

Default Icon
301 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the CLICK PLC
Connecting the Modules Together
CLICK PLCs and I/O modules connect together using the Extension Ports that are located
on the side panels of the modules. The modules secure together by sliding LOCK/UNLOCK
latch tabs located on the top and bottom panels of the modules. A PLC backplane or base is
not required.
When connecting an I/O module to the PLC, first remove the Extension Port covers, slide
the latches forward (unlock), align the module pins, and press the I/O module onto the PLC’s
right side. Slide the latches backward to lock the modules together.
NOTE: If you are using other components in your system, make sure you refer to the appropriate manual to
determine how those units can affect mounting dimensions.
1
2
3
1) Remove extension port covers
and slide latch tabs forward.
2) Align the module pins and
connection plug, and press the
I/O module onto the right side
of the PLC.
3) Slide the latch tabs backward to
lock the modules together.
Latch
Tabs
CLICK PLC Hardware User Manual, 5th Edition, Rev. F – C0-USER-M
3–16
Chapter 3: Installation and Wiring

Table of Contents

Related product manuals