Autostacker™ Parking Lift 11 P/N 5900248Rev. B May 2021
Installation Checklist
Following are the steps needed to install an Autostacker; perform them in this order.
1. Review the installation Safety Rules.
2. Make sure you have the necessary Tools.
3. Plan for Electrical Work.
4. Select the installation site.
5. Check Clearances around the Lift.
6. Create a floor plan.
7. Position the Leg Assemblies and other components.
8. Attach the Bottom and Top Connector Tubes.
*
9. Anchor the Bases to the ground.
10. Set up the Console and attach the Power Unit.
*
11. Connect the Hydraulic Hoses.
*
12. Connect the Return Lines.
*
13. Connect the Power Unit.
*
14. Attach the Conduit Tube.
*
15. Install the Control Stands.
*
16. Wiring a Power Disconnect Switch.
17. Install a Thermal Disconnect Switch.
18. Test the Autostacker.
19. Add the Tire Trough and Tire Stops.
20. Add the Platform sections and Drive-Up Ramp.
21. Lubricate the Autostacker.
22. Review the Final Checklist.
*
Procedures modified and/or specific to a
Multi-Lift
configuration only. See Multi-Autostacker for
more information.