Autostacker™ Parking Lift 11 P/N 5900248 — Rev. B — May 2021
Installation Checklist
Following are the steps needed to install an Autostacker; perform them in this order.
☐ 1. Review the installation Safety Rules.
☐ 2. Make sure you have the necessary Tools.
☐ 3. Plan for Electrical Work.
☐ 4. Select the installation site.
☐ 5. Check Clearances around the Lift.
☐ 6. Create a floor plan.
☐ 7. Position the Leg Assemblies and other components.
☐ 8. Attach the Bottom and Top Connector Tubes.
☐ 9. Anchor the Bases to the ground.
☐ 10. Set up the Console and attach the Power Unit.
☐ 11. Connect the Hydraulic Hoses.
☐ 12. Connect the Return Lines.
☐ 13. Connect the Power Unit.
☐ 14. Attach the Conduit Tube.
☐ 15. Install the Control Stands.
☐ 16. Wiring a Power Disconnect Switch.
☐ 17. Install a Thermal Disconnect Switch.
☐ 18. Test the Autostacker.
☐ 19. Add the Tire Trough and Tire Stops.
☐ 20. Add the Platform sections and Drive-Up Ramp.
☐ 21. Lubricate the Autostacker.
☐ 22. Review the Final Checklist.