EasyManua.ls Logo

Avaya VSP 4450GSX-PWR+ - Page 23

Avaya VSP 4450GSX-PWR+
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note:
A factory-supplied 4450GSX series switch has a USB port but no USB device or cover.
Prerequisites for installing the Avaya Virtual Services Platform 4000 in an equipment rack:
Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an
EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack.
The rack is bolted to the floor and braced if necessary.
The rack is grounded to the same grounding electrode used by the power service in the area.
The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack
to the grounding electrode.
1. Attach the L-bracket to each side of the switch using a #2 Phillips screwdriver as illustrated
below.
2. Slide the switch into the rack as illustrated.
3. Insert and tighten the rack-mount screws.
Installing the Avaya Virtual Services Platform 4000 in an equipment rack
November 2016 Installing Avaya Virtual Services Platform 4450GSX-PWR+ Switch 23
Comments on this document? infodev@avaya.com

Table of Contents

Other manuals for Avaya VSP 4450GSX-PWR+

Related product manuals