EasyManua.ls Logo

Avaya VSP 4450GSX-PWR+ - Connect AC Power; Power Cord Specifications

Avaya VSP 4450GSX-PWR+
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Important:
You can hot swap power supplies while the switch is operational. One power supply is required
for continued switch operation. PoE+ load reductions can occur if you remove one power supply
while the switch is operating with dual power supplies.
Connect AC power
This section explains power cord specifications and how to connect AC power.
Power cord specifications
To connect AC power to the switch, you need an appropriate AC power cord as described in the
following table, also see the following table for plug specifications.
Table 13: International power cord specifications
Country and Plug Specification Specifications Typical Plug
Continental Europe:
CEE7 standard VII male plug
Harmonized cord (HAR marking on the outside of the cord
jacket to comply with the CENELEC Harmonized
Document HD-21)
220 or 230VAC
50 Hz
Single phase
United States of America, Canada, and Japan:
NEMA5-15P male plug
UL-recognized (UL stamped on cord jacket)
CSA-certified (CSA label secured to the cord)
100 or 120VAC
50–60 Hz
Single phase
United Kingdom:
BS1363 male plug with fuse
Harmonized cord
240VAC
50 Hz
Single phase
Australia:
AS3112-1981 male plug
240VAC
50 Hz
Single phase
Danger:
Using power cords with a proper grounding path
Connect AC power
November 2016 Installing Avaya Virtual Services Platform 4450GSX-PWR+ Switch 31
Comments on this document? infodev@avaya.com

Table of Contents

Other manuals for Avaya VSP 4450GSX-PWR+

Related product manuals