Do you have a question about the Avtron K875A and is the answer not in the manual?
Covers WARNING/CAUTION statements, insulation testing, and safety inspections.
Details precautions for touching hot parts, blocking intake, and removing panels.
Outlines emergency shutdown, fire extinguisher use, and storage guidelines.
Covers unit power, load steps, fan motor, and safety interlocks.
Details control panel layout, switches, indicators, and mounting requirements.
Describes materials, base mounting, screens, and optional digital meter.
Covers pre-operation checks, placement, clearances, and wind effects.
Details hood mounting, interconnection wiring, control wiring, and safety circuits.
Covers site selection, ventilation, and critical airflow considerations.
Explains control, motor, load connections, and proper grounding procedures.
Covers initial setup, blower activation, and load application.
Outlines shutdown procedure and automatic mode steps.
Covers overall maintenance, safety during servicing, and daily checks.
Details 3-month and annual maintenance checks.
Details various control transformer options.
Lists specifications for various digital metering units.
Describes load shedder options.
Lists metering, panel, blower circuit, and control unit options.
Details panel and stand options.
Covers intro, reference designators, and notes for ordering parts.
Lists replacement parts for control transformer options 1 through 6.
Lists replacement parts for metering and protection options 8 through 13.
Lists replacement parts for load shedder options 47 through 48.
Lists parts for metering (66-70) and control transformers (70).
Lists replacement parts for panels and stands (71-79).
Covers WARNING/CAUTION statements, insulation testing, and safety inspections.
Details precautions for touching hot parts, blocking intake, and removing panels.
Outlines emergency shutdown, fire extinguisher use, and storage guidelines.
Covers unit power, load steps, fan motor, and safety interlocks.
Details control panel layout, switches, indicators, and mounting requirements.
Describes materials, base mounting, screens, and optional digital meter.
Covers pre-operation checks, placement, clearances, and wind effects.
Details hood mounting, interconnection wiring, control wiring, and safety circuits.
Covers site selection, ventilation, and critical airflow considerations.
Explains control, motor, load connections, and proper grounding procedures.
Covers initial setup, blower activation, and load application.
Outlines shutdown procedure and automatic mode steps.
Covers overall maintenance, safety during servicing, and daily checks.
Details 3-month and annual maintenance checks.
Details various control transformer options.
Lists specifications for various digital metering units.
Describes load shedder options.
Lists metering, panel, blower circuit, and control unit options.
Details panel and stand options.
Covers intro, reference designators, and notes for ordering parts.
Lists replacement parts for control transformer options 1 through 6.
Lists replacement parts for metering and protection options 8 through 13.
Lists replacement parts for load shedder options 47 through 48.
Lists parts for metering (66-70) and control transformers (70).
Lists replacement parts for panels and stands (71-79).
| Brand | Avtron |
|---|---|
| Model | K875A |
| Category | Industrial Equipment |
| Language | English |