Do you have a question about the Avtron K975A and is the answer not in the manual?
Information proprietary to Avtron Loadbank, Inc. for use.
Personal injury/death from WARNINGs, damage from CAUTIONs.
Reading manual, grounding, not bypassing safety switches.
Dangers of heat, need for airflow, recirculation risks.
Caution for qualified personnel, power disconnection.
Emergency stop procedure and fire extinguisher requirement.
Installation responsibility, NEC/OSHA, cam-lok connector use.
2500 kW unit, two 15 HP blowers, 27,000 CFM airflow.
Airflow switches, thermocouples, temperature sensor set at 350°F.
Steel structure, enclosure heater, forklift base, mounting.
Do not exceed rated voltage or apply DC voltages.
Local panel interface, status lights, buttons, IHT connection.
Inspect for damage, importance of proper installation.
Cool, well-ventilated area, no air recirculation.
Outdoor mounting, inlet/exhaust clearances, sensitive object protection.
Avoiding recirculation, obstructions, stacking, indoor use.
Heaters for condensation, local panel mounting.
Fan/blower wiring, phase rotation, cam-lok connectors.
Grounding conductor, installation checkout steps.
Verifying placement, crimping, torquing, and control wiring.
Energizing control power, testing safety circuits and load steps.
Warnings regarding voltage, DC voltage, and blower failure bypass.
Avoid hot screens, do not exceed rated voltage.
Precautions for handling ESD sensitive components.
Importance of maintenance, power disconnection for servicing.
Daily checks for airflow, screens, and recirculation.
Three-month and annual maintenance tasks.
Access to parts, caution during fuse replacement.
Section purpose, using designators for parts identification.
Safety for technicians, power disconnection, power failure troubleshooting.
Causes and remedies for blower motor not operating.
Troubleshooting blower failure lights and fan blade problems.
Causes and remedies for load steps not energizing.
Troubleshooting contactor chattering and not achieving rated load.
Causes for blown disconnect switch fuses.
Information proprietary to Avtron Loadbank, Inc. for use.
Warranty overview, one-year limited warranty, terms of use.
Procedure for claims, items not covered, limitations.
Steps for cabling and powering up the load bank and IHT.
Configuring supply details and system options via the IHT.
Steps for applying load and viewing test data on the IHT.
Using automatic load control and pre-programmed sequences.
Diagram showing physical dimensions and required clearances.
Wiring for load contactors, wire code legend.
Wiring for control power, relays, and safety interlocks.
Assignments for Sigma controller and control panel wiring.
Wiring for manual panel, fuses, and current transformers.
Wiring for Sigma controller, IHT, and PC interface.
Wiring for manual control panel start, stop, and load functions.
Schematic of resistive load banks and fuse connections.
Diagram and list of components for resistor assembly.
Information proprietary to Avtron Loadbank, Inc. for use.
Personal injury/death from WARNINGs, damage from CAUTIONs.
Reading manual, grounding, not bypassing safety switches.
Dangers of heat, need for airflow, recirculation risks.
Caution for qualified personnel, power disconnection.
Emergency stop procedure and fire extinguisher requirement.
Installation responsibility, NEC/OSHA, cam-lok connector use.
2500 kW unit, two 15 HP blowers, 27,000 CFM airflow.
Airflow switches, thermocouples, temperature sensor set at 350°F.
Steel structure, enclosure heater, forklift base, mounting.
Do not exceed rated voltage or apply DC voltages.
Local panel interface, status lights, buttons, IHT connection.
Inspect for damage, importance of proper installation.
Cool, well-ventilated area, no air recirculation.
Outdoor mounting, inlet/exhaust clearances, sensitive object protection.
Avoiding recirculation, obstructions, stacking, indoor use.
Heaters for condensation, local panel mounting.
Fan/blower wiring, phase rotation, cam-lok connectors.
Grounding conductor, installation checkout steps.
Verifying placement, crimping, torquing, and control wiring.
Energizing control power, testing safety circuits and load steps.
Warnings regarding voltage, DC voltage, and blower failure bypass.
Avoid hot screens, do not exceed rated voltage.
Precautions for handling ESD sensitive components.
Importance of maintenance, power disconnection for servicing.
Daily checks for airflow, screens, and recirculation.
Three-month and annual maintenance tasks.
Access to parts, caution during fuse replacement.
Section purpose, using designators for parts identification.
Safety for technicians, power disconnection, power failure troubleshooting.
Causes and remedies for blower motor not operating.
Troubleshooting blower failure lights and fan blade problems.
Causes and remedies for load steps not energizing.
Troubleshooting contactor chattering and not achieving rated load.
Causes for blown disconnect switch fuses.
Information proprietary to Avtron Loadbank, Inc. for use.
Warranty overview, one-year limited warranty, terms of use.
Procedure for claims, items not covered, limitations.
Steps for cabling and powering up the load bank and IHT.
Configuring supply details and system options via the IHT.
Steps for applying load and viewing test data on the IHT.
Using automatic load control and pre-programmed sequences.
Diagram showing physical dimensions and required clearances.
Wiring for load contactors, wire code legend.
Wiring for control power, relays, and safety interlocks.
Assignments for Sigma controller and control panel wiring.
Wiring for manual panel, fuses, and current transformers.
Wiring for Sigma controller, IHT, and PC interface.
Wiring for manual control panel start, stop, and load functions.
Schematic of resistive load banks and fuse connections.
Diagram and list of components for resistor assembly.
| Brand | Avtron |
|---|---|
| Model | K975A |
| Category | Industrial Equipment |
| Language | English |