WWW.BALTIMOREAIRCOIL.COM
1
Table of Contents
RIGGING & ASSEMBLY INSTRUCTIONS » SERIES 3000 COOLING TOWER
1 Introduction
2 Safety
2 Shipping
2 Pre-Rigging Checks
3 Unit Weights
3 Anchoring
3 Cold Weather Operation
3 Location
3 Warranties
3 Unit Operation
2 Unit Rigging & Assembly
4 Rigging
5 Single-Cell Installation
5 Two Piece Section Assembly
6 Multi-Cell Installation
6 Multi-Cell Unit Assembly
6 Flume Box Installation
8 Optional Positive Closure Plate Installation
9 Fan Guard Installation
9 One-Piece Fan Guard
10 Two-Piece Fan Guard
11 Four-Piece Fan Guard
13 Top Inlet Piping Installation
15 Motor Location and Conduit Installation
3 Optional Accessory Installation
17 ENDURADRIVE™ Fan System Installation
18 Whisper Quiet Fan Installation
20 Side Outlet Depressed Sump Box Installation
21 Factory Pre-Wired Terminal Box
21 Optional Accessories and Equipment