Page 2-4 Bacharach, Inc. Instructions 67-9319
INSTALLATION INJECTOR CALIBRATOR CD3
Figure 2-9. Calibration Fluid Dipstick
Figure 2-10. Checking Cambox
Figure 2-11. Initial Checks - Hookup
Flowmeter Transducer
8. The flowmeter transducer reservoir is filled at
the factory before shipping. If additional fluid is
required, see Section 2.6.
2.5 Pre-operation Checks
Before trying to operate the calibrator for the first
time be sure to complete all the initial checks and
start-up procedures given in Section 2.6.
CAUTION
CALIBRATOR CAN BE DAMAGED. Do not
operate the calibrator until all items on the
check list in Section 2.6 have YES re-
sponses.
2.6 Initial Checks
Before operating the calibrator for the first time
after installation, complete the following checklist.
ALL RESPONSES SHOULD BE “YES”.
PRE-OPERATION CHECKLIST
CONDITION YES NO
_______________________________________________
1. The On/Off Switch is in the _____ _____
OFF position.
2. The electrical power supplied _____ _____*
corresponds to the data on the
nameplate inside the left side
door (See Section 2.3).
5 Cambox Plug
2 Fill to "F" Mark on Dipstic
k
6 Fill Cambox to 3-3/4 Inches fromTop
3 AIR IN 4 WATER IN 1 On/Off Switch
5 WATER OUT
2 Electrical Power Inlet
(terminal connections
inside left door)
2 Electrical Nameplate
(inside)