5
-
22
▶
Land leveling pattern
● The land leveling work may be
performed after crushing soil or
not.
● The vehicle speed can be set fast-
er when performing the land level-
ing work with soil crushed already.
● When working in a wet field, fill
the eld with a sucient amount of
water so that the trace of plowing
cannot be seen.
● The border shown in the figure
should be set a little narrower than
two times of one plowing width.
● Refer to the alternating returning
pattern for other details.
Moving direction Reverse driving
Finish
A: Border
Start
(15) (11)
(9) (13)
A
(14)
(10)
(4)
(5)
(3)
(6)
(2)
(7)
(1)
(8)
(12)
● Turning:
BB1022H.indb 22BB1022H.indb 22 2021-06-28 오후 5:53:262021-06-28 오후 5:53:26