EasyManua.ls Logo

Bad Boy 3026H 2021 - Page 90

Bad Boy 3026H 2021
152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
-
17
OPERATION
5
2. Check if both brake pedals are in-
terlocked.
(1) Brake Pedal
3. Lift the implement.
4. Control the hand throttle lever. In-
crease the engine rpm from low to
high speed gradually.
(1) Position Control Lever
(A) Lowering (B) Lifting
(1) Hand Throttle Lever
: Faster Engine RPM (A)
: Slower Engine RPM (B)
2024h_3026h.indb 172024h_3026h.indb 17 2020-09-18 오후 6:17:262020-09-18 오후 6:17:26

Table of Contents

Related product manuals