8
1 800 463.2187 Monday to Thursday from 8 a.m. to 6 p.m. (EST)
.
Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © June 2023 Bains Ultra Inc. All rights reserved. 45200682
LIBRA COLLECTION | INSTALLATION INSTRUCTIONS
SITE PREPARATION
There is a technical specication sheet for each BainUltra
®
ThermoMasseur
®
which includes information such as necessary
dimensions of site before installation. If you do not already have the technical specications, download it from the BainUltra
®
Website at: bainultra.com or call us at: 1 800 463-2187.
FLOOR
1500 LB
(680 KG)
PLUMBING
• Seefaucetmanufacturer’sspecicationsforzoningandplanwatersupplylocationaccordingly.
• Position drain according to bath’s technical specications.
• Leave access to Geysair junction hose.
WARNING
• Libra freestanding bath cannot be drilled for faucet installation.
Faucets must be freestanding or wall-mounted models.
BEDDING
Beforeinstalling,ensurethattheoorunderneaththebath
cansupport1500lb(680kg).Nospecialbeddinginstallation
isrecommendedbymanufacturer,thebathtubcansitdirectly
ontheoor.
Ifthebathisinstalledonthegroundoororbasement
(concreteslab),theopeningunderthebathmustbeairtight
toavoidcondensation.