5 Before installation
34
Combi 2
Caution
RISK ASSESSMENT - Before commencing the installation it is
recommended that the "Five Steps to Risk Assessment"
document published by the HSE is consulted, and an assessment
performed as described. GAS SUPPLY - The gas supply, gas
type and pressure must be checked for suitability before
connection.
5.6 Unpacking & initial preparation
5.6.1
Unpacking
Fig.26 Unpacking the boiler
See
Handling, page 9 befor
e unpacking or lifting the boiler.
To unpack the boiler:
1. Remove the banding and the cardboard sleeve.
2. Remove the polystyrene top piece and installation kit.
3. Snap off the rear part of the polystyrene bottom piece.
Important
Polystyrene base should be removed completely if fitting the boiler
into a space with minimum side clearances of 5 mm each side.
Important
If removing the polystyrene base, the sealing caps can also be
removed at this stage. Care must be taken to avoid damage from
any residual water in the boiler.
b
LIFT
a
LIFT
BO-0000071