EasyManua.ls Logo

Bazzaz ZFi - Connect Components; Front Injector Connection; CKPS Connection; TPS Connection

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5>CONNECT
5.3
1. Locate the factory TPS lead, which can
be found beneath the airbox on the
right hand side of the bike.
2. Carefully make a small cut into the
factory sheathing to expose the factory
wires.
3. Separate the factory orange/brown
wire.
4. Using the supplied scotchlok crimp onto
the factory orange/brown and connect
the Bazzaz TPS connector.
1. Locate the factory front injector, which
can be found between the radiator and
cylinder valve cover.
2. Disconnect the factory injector
connector and install the Bazzaz
injector connectors inline (To ease in
the installation you may loosen the
radiator to create more space).
5.1
BAZZAZ
FACTORY
1. Locate the factory black three pin
CKPS connector, which can be
found on the right hand side of
the bike attached to the inside of
the frame.
2. Disconnect the factory CKPS
connectors and install the
Bazzaz CKPS connectors inline.
5.2
BAZZAZ
FACTORY
BAZZAZ
FACTORY