Use the supplied cable ties to secure the harness neatly
along the routing path free of any moving or hot components
(which could cause damage or failure of the system).
9>SECURE
8>O2 ELIMINATION
1. Locate the factory front and rear O2 sensors. The front O2 sensor connector can
be found on the front left of the bike near the radiator hoses. The rear O2 sensor
connector can be found on the right hand side of the bike near the rear cylinders
valve cover.
2. Disconnect the factory O2 sensor and install the Bazzaz O2 stabilizer.
3. Connect each O2 stabilizer ground to a good chassis ground.
7>QUICKSHIFT
(FOR USE WITH Z-FI TC ONLY!)
1. Measure and note your shift pedal height so you may reposition the shift pedal
once complete.
2. Remove the factory shift rod and begin to install the Bazzaz shift switch using one
of the supplied allen stud bolts and tighten.
3. Begin to install the Bazzaz shift rod. The shift rod may need to be cut to get your
original shift pedal height.
4. Ensure to retighten all lock nuts on the shift linkage (Aftermarket rear sets are
required for shift switch installation).