EasyManua.ls Logo

BCI Capnocheck Plus - System Testing Procedures; Test Equipment and Visual Inspection; Power Supply Verification

Default Icon
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter
5:
System
Testing
Chapter
5:
System
Testing
Test
Equipment
and
Tools
Required
A.
Flow
meter.
B.
Voltmeter
Visual
Inspection
A.
Check
that
all
hardware
is
secure.
B.
Check
that
all
pneumatic
connectors
are
secure.
C.
Check
that
all
electrical
connectors
are
properly
oriented
and
securely
connected.
D.
Check
cosmetic
appearance
and
mechanical
fit.
E.
|
Check
that
all
labels
are
properly
placed
and
undamaged.
Power
Supplies
Main
Board
Battery
Charger.and
Power
Supply
Test
A.
Verify
charger
operation
with
no
battery
plugged
in
by
checking
the
following
test
point:
1.
With
the
(-)
of
the
DMM
to
TP1,
verify:
TP2
10.0
0.5V
B.
Verify
the
power
supply
operation
with
battery
plugged
in
by
checking
the
following
test
point:
1.
With
the
(-)
of
the
DMM
connected
to
TP1,
verify:
TP2
5.0
to
7.2
V
(+VBATT),
depends
on
the
state
of
the
battery
charge
TPS
250
+
50
mV
(-VBATT),
unless
in
trickle
charge
mode
TP8
5.0+0.1
VDC
(VRAM)
TP7
5.00
+
0.05
V
(+5VPWR)
Capnocheck
Plus
Service
Manual
5-1