6 | BDIUSA.COM CORRIDOR 8177
Slide (E) Metal Leg into (F) Metal Rail and attach
by using (B1) Hex Wrench and 8 (D) Screws.
NOTE: You MUST align arrows on (F) Metal Rails with
arrows on (E) Metal Legs for proper orientation.
Removal of wheels (optional):
Detach Wheel Assembly from
(E) Metal Leg by removing the
Leveler and Screw.
Reinstall Leveler
to (E) Metal Leg.
PART/DESCRIPTION QTY
B1-HEX WRENCH 1
D-SCREW 8
D
E E
STEP 1. BUILD THE BASEASSEMBLY
For your convenience, wheel assembly is pre-installed. Wheels can be removed if desired.
Æ
Æ
Æ
Æ
D
DD
D
F
F
EE
F
E
E
F