EasyManua.ls Logo

bedTech BT4000 - Installation Guide; Unboxing and Initial Setup; Component Installation and Connection; Final Assembly and Securing

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Two people are required to set up the foundation.
STEP 1
STEP 2
STEP 3
Place the foundation box in a
desired location with the bottom
of the box facing up.
Remove the binding straps and
packing materials, making sure
not to puncture the box with any
sharp objects.
Remove the foundation from the box, keeping the bottom of the
foundation facing upward for easier access to the bed's components.
To install the legs, thread the
bolt of the leg to the nut on
the foundation frame, and
tighten by hand. DO NOT
OVERTIGHTEN.
STEP 6
STEP 9
STEP 7
STEP 8
Uncoil the power cord and connect it to the
power supply.
Locate the mattress retainer bar brackets.
Slide the left side of the mattress retainer bar into the bracket. Pull
the retainer bar to the opposite bracket and secure the right side.
Carefully ip the foundation over onto its legs.
Important: Two people are required to move the foundation.
Do not drag across the oor. Do not rest frame on its side;
excessive pressure may damage the legs.
Ensure that batteries are correctly
installed.
NOTE: To avoid damage to the foundation,
always open the carton while the bed is in the at
position.
—07—
STEP 4
STEP 5
Locate the power supply
and install (2) 9-volt batteries (not
included).
Uncoil the input power cord
(connected to the control box’s
power port) and plug it into the
power supply.
Installation Guide
Customer Service: 1-855-430-8943

Related product manuals