—05—
Installa
1. Open the shipping box, cut the ribbon securing accessory
carefully, and then put it on a flat floor.
2. To install all six legs (seven for king/CK size,see image A on
3. Uncoil the input power cord (connected to the control box’s
power port) and plug it into the power supply.
4. Uncoil the power cord and connect it to the power supply.
Do not drag across the floor. Do not rest frame on its side;
excessive pressure may damage the legs.
7.
Pull the retainer bar to the opposite bracket and secure the
right side.
A
Head
Foot
Customer Service: 888-236-3044