Cooling
The internal cooling enables a maximum of 50
quickly successive castings. If the E 20 message is
issued, switch off the unit and let it cool.
1. Remove the panel on the left side (loosen
knurled screws).
2. As shown, remove both stoppers and take out
the funnel.
3. Fill up to the "max" mark with approx. 1.5 litres
of drinking water.
4. Drain excess water as shown!
5. Finally, replace both stoppers and stow the
funnel.
The warning signs provided (symbol:
"pacemaker") are to be placed at the
entrances to the room in which the
ready-to-operate machine is located!
Burn hazard!
If there was casting beforehand, the
water can reach temperatures of up to
70 °C!