5.4 AC PARALLEL OPERATION
WARNING!
Do not start the generators before connecting the parallel cable.
If the cable is connected while one generator is running it will be
overloaded.
NOTE
For continuous operation do not exceed the combined rated power.
Stop the engine before connecting or removing the parallel cable.
For single unit operation the parallel cable must be removed.
The onboard generator outlets will not function when the parallel kit is
plugged in.
1. Make sure both generators are OFF.
2. Connect the two parallel connectors to the two parallel sockets of each
generator.
3. Connect the ground wires to the ground terminal of each generator.
4. Start each engine according to ‘Starting the Engine’ chapter.
5. Conrm appliances are turned off, then connect the appliance to the
parallel kit.
6. Turn on the appliance.