Page 35 of 44 17.07.2014
Ver. 3.3 © Berner Kochsysteme 2015
Installation instructions for an flush-mounting frame
(Ver. B) of Berner Induction units
Please observe the following installation instructions. The only way to ensure a trouble
free operation and a long life time. To ignore the following guidelines will void the
warranty.
Make the cut in the surface in accordance with the
installation drawing. (Please use only detailed
drawings).
Use only suitable materials (stainless steel at
least 3mm or granite).
the bolts M6 on the bottom on the surface shown
(installation drawing) “mounting frame”.
the mounting frame to the bottom.
Observed tensile strength of the weld stud
and tightness of the screws
.
tion unit from the top and install the
. Please follow this regulations: generator coil
Feeler-, display- and control cables have to be
separate from the coil and generator cables and
it`s possible be covered in a steel channel.