EasyManua.ls Logo

Bezzera BZ02 PM - Machine Installation; Warning; Installation Presetting; Electrical Connection

Bezzera BZ02 PM
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
cod.9941038.01 ed.02/04 rev.01
BZ02PM_BZ02DE
English
4 MACHINE INSTALLATION
4.1 Warning
The installation must be carried out by qualified operators according to manufacturer’s
instructions and laws in force.
4.2 Installation Presetting
Put the machine on a plane surface with sizes and solidity suitable to overall
dimensions of the equipment.
For the description of connections, refer to the table on page 27 and 28 in this
instruction booklet.
The machine is electrically powered and requires for its operating:
- power supply connection.
- water supply connection (R version).
- drain system connection (R version).
4.2.1 Electrical Connection
Warning:
- The power supply connection must be carried out by qualified personnel.
- The installation must be carried out in compliance with the laws in force and must
be equipped with proper grounding.
The machine is supplied with power cable and plug 16 Ampere according to EEC
regulations.

Table of Contents