EasyManua.ls Logo

BIG RED JACKS SJ10 - Operation Procedures

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
OPERATION
1. Select the appropriate lifting capacity mechanical
bottle screw jack.
2. Place the jack on a hard and level surface
beneath the load that is to be lifted.
3. Use hand to turn the lifting screw (counter-
clockwise) out until the adjustable oating head
support makes
contact with the surface to be lifted.
4. Insert steel handle-turning bar (not supplied) into
hole under lifting support.
5. Rotate steel handle bar counter-clockwise to
raise the lifting support until the desired height is
reached.
Do not exceed the rated load of the mechanical
jack.
WARNINGS: