EasyManua.ls Logo

Billion SG3010 Series - Sg3010;Sg3015-T2

Billion SG3010 Series
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
SG3010/SG3015-T2
1. Connect the Power Meter’s output power end to the electrical appliance at the load output
terminal that you intended to monitor.
2. Connect the input power end to the power supply terminal.
3. Set up the connection between SG3010/SG3015 – T2 and ZigBee Coordinator
(Please refer to Networking Setup section).