10
SG3010/SG3015-T4
Note: Ensure the power in the main switch box has been turned OFF while installing the
product.
1. Following the instructed electricity current direction at the bottom of the split-core CT to
install the 2 CTs to L1 and L2 respectively.
2. Connect the 2 input power ends to the load output terminals of the main switch, the Black
wire to “L1”, and the White wire to ”L2”.
3. Set up the connection between SG3015 – T4 and ZigBee Coordinator (Please refer to
Networking Setup section).