EasyManua.ls Logo

Binks E2-7 - Page 8

Binks E2-7
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
Ø20 - 25 I.D. [-1 to 10 bar working pressure]
Check that the oil plug on top of Gearbox has been replaced with the correct venting plug.
The vent plug is supplied in a bag attached to the gearbox.
e.g.,
Suction -
INSTALLATION
Outlet -
Ø15 - 25 I.D. [20 bar working pressure]
Ensure adequate air space around the Pump for maintenance and electric motor cooling requirements.
Attach suitable flexible hoses to the inlet and outlet connections.
Ensure the gearbox is filled with oil.
(The gearbox is filled with the correct amount of oil at the factory)
77-3245 R1.0 8/36 www.carlisleft.com

Related product manuals