E2-7
Electric Drive Pump
(EU Model)
(USA Model)
(Japan Model)
IT IS THE RESPONSIBILITY OF THE EMPLOYER TO PROVIDE THIS INFORMATION TO THE
OPERATOR OF THE EQUIPMENT.
77-3245 R1.0 www.carlisleft.com
Question and Answer IconNeed help?

Do you have a question about the Binks E2-7 and is the answer not in the manual?

Binks E2-7 Specifications

General IconGeneral
BrandBinks
ModelE2-7
CategoryWater Pump
LanguageEnglish

Summary

EU Declaration of Conformity

SPECIFICATION

DIMENSIONS AND MOUNTING DETAILS

INSTALLATION

Pressure Relief Valve

Mechanical solution for preventing pump and paint system overpressure.

Pressure Switch (Optional)

Connect to outlet manifold port to stop pump on overpressure.

Electric Motor

For hazardous areas, must be wired for clockwise rotation; PTC sensors included.

Inverter

Details required inverter settings for motor speed and acceleration/deceleration.

SYSTEM OPERATION

Before starting

Ensure connections, interlocks, material availability, and outlet are correct before operation.

Smart Mode

System adjusts flow rate to maintain set pressure based on fluid demand.

PARTS LIST - Pump Assembly

PARTS LIST - Mechanical Assembly

PARTS LIST - Bell Housing & Shaft Assemblies

PARTS LIST - Mechanical Assembly - Carriage Part No. 192849

PARTS LIST - Fluid Section E2-7 (194867)

PARTS LIST - Piston Assembly 193357

PARTS LIST - Shaft & Bellows Assembly E2-7 (194872)

PARTS LIST - Manifold & Prv Assembly E2-7 (194899)

Maintenance

General Maintenance

Working life affected by fluid abrasiveness, duty cycle, and pressure requirements.

Maintenance Schedule

Details daily, weekly, 3-monthly, 6-monthly, annual, and 5-year inspection and operation tasks.

Gearbox Maintenance

Verifies seals/gaskets, factory-filled oil, and replacement procedures for leaks.

Motor Maintenance

Covers Ex motor maintenance per EN 60079-17 and repair procedures per IEC 79-19.

Fault Finding - Mechanics

Fault Finding - Fluid Section

Testing and Lubricating

Testing and Lubricating after major overhaul

Procedure for connecting, running, and lubricating the pump after significant maintenance.

Fluid Drain Down

Steps for safely draining fluid, including using solvent for final cleaning.

SPARE PARTS LIST

ACCESSORIES

NOTES

WARRANTY POLICY