Operating Instructions BMP-E165
Section 7 – Maintenance April 2006
©Blastrac April 2006
34
7.2 Maintenance and Inspection List
The following maintenance schedule should be strictly
followed to insure personnel safety, as well as proper
operation and efficiency.
12 hours after repairs:
• Check all safety devices for effectiveness.
• Check all accessible screw connections for correct fit and tightness.
Daily and before starting work:
• Check all power supply cables for damage.
• Check dust collector hose for damage.
• Verify that there is no foreign material in the scarifier drum.
• Verify that the dust container of the dust collector is empty.
• Check the scarifier drum, lateral axle, scarifier cutters and housing for
wear.
Yearly:
• Full overhaul and cleaning of the complete machine.
7.3 Repairs
This Manual only describes repairs that occur during maintenance work or those
repairs that are required when replacing worn parts.
As with starting for the first time, we recommend that our
Blastrac personnel carry out the first repairs of all Blastrac
machines. This allows the equipment users operating and
maintaining the machine the opportunity to become extensively
familiar with the proper repair procedures.