36
STEP
6
Be careful to assemble all components
in the sequence they are presented.
1. Slide Foam Roller Bar 39 into the opening in Lower Main Frame A as shown.
Slide two Plastic Washers 25 and two Foam Rollers 22 onto Foam Roller Bar 39 as shown.
Hold Foam Rollers 22 in place with two Foam Roller End Cap 24 as shown.
2. Slide Foam Roller Bar 39 into the opening in Seat Pad Frame L as shown.
Slide two Plastic Washers 25 and two Foam Rollers 22 onto Foam Roller Bar 39 as shown.
Hold Foam Rollers 22 in place with two Foam Roller End Cap 24 as shown.
3. Slide Foam Roller Bar 39 into the opening in Leg Extension Arm K as shown.
Slide two Plastic Washers 25 and two Foam Rollers 22 onto Foam Roller Bar 39 as shown.
Hold Foam Rollers 22 in place with two Foam Roller End Cap 24 as shown.
NOTE:
You can now go through the main frame unit and double check that all bolts and nuts are
wrench tight. Do NOT re-tighten any of the pad bolts.
Leave all pulley bolts hand tight until after cable installation in Step 10.