EasyManua.ls Logo

Borri 1Kva - Chapter 4. Installation and Operation

Borri 1Kva
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Chapter 4. Installation and Operation
Note: The packing condition and the external outlook of the unit should be
inspected carefully before installation. Retain the packing material for future use.
4.1. Unpacking
1. Take the UPS out of the PE foam.
2. Remove the packing materials.
Note: The UPS module is approx. 12.5~39 kgs, be cautious when unpacking
and lifting the unit to avoid injury.
3. Standard Package includes:
a. User's Manual
b. AC Input Power Cord ( Not available for hard wiring connection models)
c. IEC output cables ( for the UPS with IEC sockets only)
d. RJ11 Phone Jack Cable
e. UPS communication kit (optional)
4. Accessories for Tower and Rack Mount
Optional
Optional
13
4.2. Selecting Installation Position
It is necessary to select a proper environment to install the unit, in order to
minimize the possibility of damage to the UPS and extend the life of the UPS.
Please follow the instructions below:
1. Keep at least 20cm (8 inches)
clearance from the rear panel of the
UPS from the wall or other
obstructions.
2. Do not block the air-flow to the
ventilation openings of the unit.
3. Please ensure the installation site
environmental conditions are in
accordance with the UPS working
specifications to avoid overheat and
excessive moisture.
4. Do not place the UPS in a dusty or
corrosive environment or near any
flammable objects.
5. This UPS is not designed for
outdoor use.
www.upsdirect.com

Related product manuals