3. SYSTEM WIRING SPECIFICATION
Please check the following contents were supplied within the box. If any equipment is missing, ring you local distributor for replacement.
ACCESSORIES
NAME QTY. SHAPE USE
Installation & operation
manual
1
For the SBOX installation and
operation instructions
Heat-insulated pipe
2-12
(Follow the SBOX model)
For heat insulation of pipe
connectors
Flexible drainage pipe 1
Connect the drainage port of SBOX
and the PVC water pipe.
Clamp 1
Fasten the connector between
flexible drainage pipe and SBOX
drainage port.
Three-way connector
1 pair
(for SBOX02E)
Parallel connect the two groups
of pipes, to enlarge the capacity
output
Five-way connector
1 pair
(for SBOX04E)
Adapter pipe
1 pair (for SBOX01)
2 pairs(for SBOX02)
4 pairs(for SBOX04)
6 pairs(for SBOX06)
Use for the indoor unit capacity is
2.2~4.5kW
Copper nut
1-11
(Follow the SBOX model)
Use for connecting the pipes of the
indoor unit
Adapter pipe
1
(for SBOX01)
Use for connecting the liquid side of
the outdoor unit
LOCAL PURCHASED COMPONENTS
Copper Pipes
(Drawn copper pipes
GB1527-1987)
Indoor unit capacity 2.2~4.5kW 5.6~16.0kW Note
Liquid side pipe Φ6.4×0.8 Φ9.5×0.8
Use for the connection of SBOX and
indoor unit refrigerant system (TP2M).
The length selection is according to
actual needs.
Gas side pipe Φ12.7×0.8 Φ15.9×1.0
PVC drainage pipe For drainage pipe of SBOX, according to the actual needs for the length.
Heat-insulated pipe
The inner diameter should be same with the relative copper pipes and PVC pipes, the thickness should be (more than)
10mm, especially thicker for the closed wet area.
Table:3-1
Table:3-2
4 | SYSTEM WIRING SPECIFICATION
6720862460 (16/04) CLIMATE 5000 VRF