Commissioning
45
Climate Class 6000i/8000i – 6721831489 (2022/11)
To connect the communication cable:
Open the top cover and front cover.
Release the locks on the top cover.
Hold the top cover against your own body and lift.
Unhook the front cover and pull towards the front along the rail.
( Fig. 15).
Process the end of the connecting lead [3] for the indoor unit
( Fig. 16 to 17).
Remove screw [4] and cover [5] of the terminal.
Knock out an opening for the cable feed on the rear of the indoor unit
and feed the cable through.
Connect the cable to terminal N, 1, 2.
Connect protective conductor [2] to .
Note assignment of wires to the terminals.
Reattach the cover of the switch on terminal.
Fasten front and top cover again.
Route the cable to the outdoor unit.
3.5.3 Connecting the outdoor unit
A power cable (3-wire) is connected to the outdoor unit and the
communication cable is connected to the indoor unit (4-wire).
Use cables of the type H07RN-F with sufficient conductor cross-section
and protect the mains power supply with a fuse ( Table 7).
Table 7
Prepare the end of the power cable ( Fig. 18).
Prepare the end of the communication cable ( Fig. 19).
Remove the covers [3+6] of the electrical connection ( Fig. 20).
Model CLC6001i... only has the cover [3].
Secure power cable [2] and communication cable [1] to the strain
relief [4]. If necessary, insert the supplied inlay [5] in-between.
Secure power cable to terminals N, 1, and .
Secure the communication cable to terminals N, 1, 2 and
(assignment of wires to terminals same as indoor unit).
Reattach the covers.
4 Commissioning
4.1 Commissioning checklist
Table 8
4.2 Functional test of device
The system can be tested once the installation including tightness test
has been carried out and the electrical connection has been established:
▶Connect the power supply.
Switch on indoor unit with the remote control.
▶Hold the ON/OFF [1] key pressed for 5 seconds to set the
Cooling mode ( Fig. 21)
A beep sounds and the ON indicator flashes.
Test cooling mode for 5 minutes.
Ensure freedom of movement of air baffle [2].
Select the heating mode on the remote control.
Test heating mode for 5 minutes.
Press the ON/OFF key again to stop the operation.
4.3 Handover to the user
When the system has been set up, hand over the installation manual
to the customer.
Explain to the customer how to use the system, referring to the
operation manual.
Advise the customer to carefully read the operation manual.
Outdoor unit Mains fuse
protection
Conductor cross-section
Power cable Communication
cable
All types 16 A 1.5 mm
2
≥1.5mm
2
1 Outdoor unit and indoor unit are correctly installed.
2 Pipes are correctly
•connected,
thermally insulated,
and checked for tightness.
3 Condensate pipes are functioning correctly and
have been tested.
4 Electrical connection has been correctly
established.
Power supply is in the normal range
Protective conductor is properly attached
Connection cable is securely attached to the
terminal strip
5 All covers are fitted and secured.
6 The horizontal louver of the indoor unit is fitted
correctly and the actuator is engaged.
OBJ_DCL-6721831489-005.fm Page 45 Wednesday, October 13, 2021 11:10 AM