D9412GV3/D7412GV3 | Operation and Installation Guide | 4.0 Installation
.
Bosch Security Systems, Inc. | 10/10 | F01U143070-03 19
5. To see the points that remain untested during the
Service Walk Test:
a. Press [ESC] when point text appears. The
display shows ## PTS TO TEST.
b. Press the [ESC] key. VIEW UNTESTED ?
appears.
c. Press [ENT]. ## PTS UNTESTED appears.
d. Press [NEXT] to see a list of the points that
have not yet been tested. Move through this
list by pressing the [NEXT] key.
e. To resume the Service Walk Test, press
[ESC]. ## PTS UNTESTED appears.
f. Press [ESC]. ## PTS TO TEST appears.
g. Resume testing points. To end the Service
Walk Test, press [ESC] twice.
6. After the last point is tested, 0 PTS TO TEST
appears. Press [ESC]. The display shows ALL
PTS TESTED briefly before returning to idle text.
The Service Walk Test, when performed
on a D7412GV3, cannot display “0 PTS
TO TEST” because the D7412GV3 is
physically unable to connect to the
second POPEX Module (used for Points
129-247).
Automatic time-out returns the system to
idle text: If there is no point or keypad
activity for 20 min., the Service Walk Test
ends automatically. The keypad returns to
idle text.