EasyManua.ls Logo

Bosch Greenstar Series - Page 46

Bosch Greenstar Series
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical connection
Greenstar – 6721822579 (2021/01)
46
Connecting the supply temperature sensor (e.g. for low-loss header
or system supply pipe)
Do not exceed a sensor cable length of 33 feet (10 m).
Supply temperature sensor for system supply pipe(Fig 50, [2]) must be
installed in closest vicinity with boiler supply Tee.
Fig. 50 Mounting supply temperature sensor right next to boiler supply
[1] System secondary line – supply pipe
[2] Supply temperature sensor for system supply pipe
[3] Boiler primary line – supply pipe 1"
[4] Boiler primary line – return pipe 1"
[5] System secondary line – return pipe
Fig. 51 Electrical wiring of external supply temperature sensor
The service function 7.d connection of an external supply temperature
sensor is automatically set to 01 ( page 60).
Connecting Third party room thermostats or zone controls
A voltage free (dry contact) third party room thermostat or heat demand
from a relay panel can be used to send an ON/OFF signal to the
appliance.
Fig. 52 Electrical wiring third party room thermostat or zone control
To communicate a heat demand the third party room thermostat or zone
control must connect pins 2 and 4.
6 720 641 933-97.1o
ϑ
1
2
3
4
5
≤ 4"
(102 mm)
6 720 612 664-25.2O
6 720 641 933-70.2O
B
B
4
2
1
F
A
LS NS
LZ
NZ
9
8
7
1
2
ϑ

Table of Contents

Related product manuals