EasyManua.ls Logo

Bosch WORCESTER Danesmoor Utility Regular 2022+ 25/32 - Combustion Chamber (18;25 Regular Shown)

Bosch WORCESTER Danesmoor Utility Regular 2022+ 25/32
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Greenstar Danesmoor Utility
2022+
and Utility System
2022+
- 6 721 846 263 (2022/01) 31
5.5 Combustion chamber (18/25 Regular shown)
1. Remove the control box securing screws (A, bottom screw both
sides) and loosen the pivot screws (B, top screw both sides).
2. Lower the control box into the service position.
Fig. 42 Combustion chamber
3. Release retaining nuts and washers (C).
Remove baffle/combustion chamber access door (D).
4. Ensure one piece baffle set (E) is in the right location (F), correctly
resting on the baffle rests (G) on either side of the combustion
chamber and pushed securely into place.
Baffle sets for the 18/25 and 25/32 boilers are identified with tabs
on the front and rear edge
Fig. 43 Baffle arrangement
5. Secure baffle/combustion chamber access door (D) with nuts and
washers (C). Tighten until door is firmly secured. Do not overtighten
the nuts.
6. Release the screws (H) and remove flue manifold access cover (I).
7. Check that all the baffles (J) and baffle retainer (K) are correctly
fitted to the secondary heat exchanger.
Hook the retainer (K) over the end two baffles.
8. Check that the flue damper is correctly fitted, if required, refer to
section 5.4.1
Fig. 44
2.
3.
6.
H
7.
J
H
H
D
I
H
H
H
C
5.
1.
A
B
K
6720809436-25.1Wo
6720808218-33.1Wo
E
12/18 Baffle
18/25 & 25/32 Baffle
6720808218-34.1Wo
F
G

Table of Contents

Related product manuals