EasyManua.ls Logo

Bosch WORCESTER Danesmoor Utility Regular 2022+ 25/32 - Finishing commissioning

Bosch WORCESTER Danesmoor Utility Regular 2022+ 25/32
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Greenstar Danesmoor Utility
2022+
and Utility System
2022+
- 6 721 846 263 (2022/01) 45
6.4.7 Central heating
1. Open all radiator valves.
Set room thermostat to maximum.
Set programmer to ON for CH, OFF for DHW (if applicable).
Turn the thermostat control (A) to max.
Ensure all radiators are heating up evenly and balance the system to
the temperature difference required for the heating flow and return
according to the heating load.
Fig. 71
2. Set the room thermostat to minimum.
Check that any other controls that are fitted to the system are
operating properly.
Fig. 72
6.5 Finishing commissioning
Pivot the control box (A) figure 74 up and into the boiler. Secure with
screws (B).
Utility system only:
Refer to figure 73
Slide the expansion vessel up and locate the top edge into the
bracket [1] located under the control panel.
Push the expansion vessel in until the bracket on the expansion
vessel aligns with the bracket on the cross member.
Secure with the screw [2] removed earlier.
Fig. 73 Expansion vessel location
1.
A
6720809436-16.1Wo
2.
6720809436-17.1Wo
2
1
6720809436-18.1Wo

Table of Contents

Related product manuals