Installation, Commissioning and Servicing instruction manual
Floor Standing oil-fired Condensing Boiler using Conventional Flue & Room Sealed Flue
Greenstar Danesmoor Utility Regular
2022+
& Utility System
2022+
12/18, 18/25, & 25/32
6720809436-00.1Wo
For fully pumped open vent or sealed central heating systems and domestic hot water cylinders
These appliances are for use with Kerosene (Class C2) only.
6 721 846 263 (2022/01) UK/IE

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Bosch WORCESTER Danesmoor Utility Regular 2022+ 25/32 and is the answer not in the manual?

Bosch WORCESTER Danesmoor Utility Regular 2022+ 25/32 Specifications

General IconGeneral
ModelWORCESTER Danesmoor Utility Regular 2022+ 25/32
CategoryBoiler
ManufacturerBosch
Year2022+
TypeRegular
Output25/32 kW
Fuel TypeOil
Dimensions (H x W x D)855 x 370 x 600 mm
MountingFloor

Summary

Installation regulations

Complying with the building regulations

Details requirements for adhering to building regulations, OFTEC schemes, and British Standards for safe installation.

Appliance information

Technical data

Presents detailed technical specifications for the boiler models, including output, capacities, and dimensions.

Pre-Installation

Cleaning primary systems

Details essential steps for cleaning primary heating systems, including safety precautions and flushing procedures.

Oil supply

Provides crucial guidance on oil supply systems, including gravity feed, sub-gravity feed, and suction lift configurations.

Condensate discharge

Details requirements for condensate pipework, including fall, material, and routing to prevent freezing and ensure proper drainage.

Boiler locations and clearances

Specifies safe installation locations and required clearances around the boiler, including warnings about carbon monoxide.

Rooms containing a bath or shower

Outlines specific restrictions for installing boilers in bathrooms due to electrical safety and zoning regulations.

Flue gas system considerations

Addresses important factors for flue systems, including accessibility, room air operation, and combustion air quality.

Flue terminal positions

Illustrates various flue terminal positions with minimum clearance requirements to ensure safe discharge and prevent nuisance.

Flue options

Conventional flue (CF)

Explains requirements for conventional flue installations, including material suitability, sizing, and terminal positioning.

Room sealed flue options

Details specifications for room sealed flue configurations, including maximum lengths, bends, and terminal fitting.

Plume management

Plume terminal positions

Illustrates minimum clearances and positioning requirements for flue terminals to manage plume dispersion effectively.

Installation

Boiler installation

Step-by-step instructions for physically installing the boiler unit, including panel removal and burner handling.

Flue installation

Refers to separate instructions for fitting flue kits, noting outlet options and minimum flue lengths.

Oil burner and pump

Guides on handling the oil burner and pump, including nozzle access, replacement, and break plate alignment.

Electrical

Covers all aspects of electrical installation, including safety, access, wiring diagrams, and connections.

Utility - 230V Standard wiring diagram

Presents the standard 230V wiring diagram for the Utility boiler, showing component connections and colour coding.

Utility System - 230V Standard wiring diagram

Shows the 230V wiring diagram specifically for the Utility System model, including component labels.

Commissioning

Pre-Commissioning checks

Lists essential checks to be performed before starting the commissioning process, ensuring all connections and supplies are correct.

Starting the appliance

Covers the initial steps for starting the boiler, including oil supply priming and burner operation procedures.

Combustion checks

Outlines the process for performing combustion checks, measuring CO2 levels, flue gas temperature, and adjusting settings.

Hand over

Details the crucial handover process, including customer instruction on operation, safety, and documentation.

Service and Spares

Re-commissioning the burner

Outlines the steps for re-commissioning the burner after service, focusing on seal integrity and gas-tight connections.

Fault finding and diagnosis

Logic for the 535 SE/LD RDB control box

Details a logic flowchart for diagnosing faults related to the 535 SE/LD RDB control box and its associated components.

Oil appliance commissioning checklist

A comprehensive checklist for competent persons to verify correct installation and commissioning, ensuring compliance.