Commissioning
Greenstar Danesmoor Utility
ErP+
and Utility System
ErP+
- 6 720 821 720 (2018/04) 43
Locate the top edge of panel (C) onto the supporting ledge (D) and
secure near the top and at the bottom by gently pushing home the
ball studs into the retaining slots (E). Remember always to apply
pressure at the edges of the panels to avoid damage.
Locate the top panel (F) onto the rear brackets (G) and press down
to secure the ball stud connections (H). Always apply pressure at the
edges of the boiler panels when securing to avoid accidental damage.
Fig. 75
6.5.1 Hand over
Complete the Boiler commissioning checklist at the back of this
manual and CD11 or an equivalent commissioning form.
Set up the controls and show the customer how to operate all the
controls shown in the User Guide plus any external controls.
Instruct the customer on:
Sealed systems: The need to re-pressurise the appliance
occasionally and the pressure expected at the pressure gauge.
Sealed systems: Location of the filling loop and system pressure
gauge.
Sealed systems: The use of the filling loop and how to re-
pressurise the system.
How to use the TRVs.
How to reset the appliance.
Show the customer the fault finding information in the User guide.
Show the customer where the serial number/appliance information
is when they call in with a problem (Boiler commissioning checklist at
the rear of the manual).
Give the customer details of how to contact the installer/emergency
numbers.
Show the customer how to safely isolate the appliance.
Advise the customer where they can find information on the
Worcester, Bosch Group website www.worcester-bosch.co.uk.
Advise the customer that the varying external temperatures will
affect the output of the appliance, especially the DHW.
Ensure that the User Guide and Installation, Commissioning and
Service manual, with the Boiler commissioning checklist and service
record, is left with the appliance or homeowner.
If the appliance is unused and exposed to freezing conditions, shut
off all the mains supplies and drain the system and appliance, label
accordingly.
Show the customer the location of the condensate pipe run for
external/unheated areas that maybe at risk of prolonged cold
temperatures.
6.5.2 Appliance guarantee
This appliance has a guarantee against faulty materials or workmanship
for a period from the date of installation subject to the following terms
and conditions:
During the period of this guarantee any components of the appliance
which are proven to be faulty or defective in manufacture will be
exchanged or repaired free of charge by Bosch Thermotechnology
Ltd.
The householder may be asked to prove the date of installation, that
the appliance was correctly commissioned and, where appropriate,
the first year's service has been carried out to the satisfaction of
Bosch Thermotechnology Ltd., when requested. These should be
documented as a part of the Boiler commissioning Checklist.
The appliance has been used only for the normal domestic purposes
for which it was designed.
This guarantee does not affect your statutory rights.
B
B
D
F
G
H
E
E
A
C
6720809436-19.2Wo

Table of Contents

Related product manuals