EasyManua.ls Logo

Bosch ZBR 100-3 - 10 Environmental Protection;Disposal; Environmental Protection and Disposal; 11 Inspection and Service; Important Information

Bosch ZBR 100-3
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Environmental protection/disposal
Condens 5000W – 6720813952 (2019/02)
26
10 Environmental protection/disposal
10.1 Environmental protection and disposal
Environmental protection is a fundamental corporate strategy of the
Bosch Group.
The quality of our products, their economy and environmental safety are
all of equal importance to us and all environmental protection legislation
and regulations are strictly observed.
We use the best possible technology and materials for protecting the
environment taking account of economic considerations.
Packaging
Where packaging is concerned, we participate in country-specific
recycling processes that ensure optimum recycling.
All of our packaging materials are environmentally compatible and can be
recycled.
Used appliances
Used appliances contain valuable materials that can be recycled.
The various assemblies can be easily dismantled. Synthetic materials are
marked accordingly. Assemblies can therefore be sorted by composition
and passed on for recycling or disposal.
11 Inspection and service
To safeguard the efficiency of the wall mounted gas condensing boiler
and avoid possible technical problems, the wall mounted gas
condensing boiler must be inspected and serviced at least once a year.
WARNING:
Gas explosion!
Turn off gas valve before working on gas-carrying components.
Check for leaks before working on gas-carrying components.
WARNING:
flue gas poisoning.
Check for leaks before working on gas-carrying components.
CAUTION:
Risk of electric shock.
When performing measurements and adjustments at the wall
mounted gas condensing boiler, never touch the burner control unit,
fan or pump. These are 230 V parts.
Always isolate the wall mounted gas condensing boiler from the
power supply before working on the electrical parts.
11.1 Important information
You will need the following measuring devices and tools:
Pressure gauge with a measurement accuracy of 0.01 mbar.
Use only original spare parts.
When carrying out the work, check all removed gaskets for damage,
deformation or ageing and replace if necessary.
11.2 Remove the gas-air unit
Remove the mains plug and control signal to the fan.
Fig. 51 Removing the mains plug of the fan
Remove the gas supply pipe.
Fig. 52 Removing the gas supply pipe
Remove the air intake pipe from the fan.
Fig. 53 Detaching the air intake pipe (Detail: Type 70)
0010010038-001
0010010040-001
0010010041-001
2.
1.

Table of Contents

Other manuals for Bosch ZBR 100-3

Related product manuals