EasyManua.ls Logo

Bresser 4Cast PRO - Install Rain Gauge Funnel; Install Rechargeable Batteries; Install Wind Vane

Bresser 4Cast PRO
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
48
3.1.1 INSTALL WIND VANE
With reference to photo below, (a) locate and align the at are on the wind vane shaft to the
at surface on the wind vane and push the vane onto the shaft. (b) tighten the set screw with a
precision screwdriver.
Step 1 Step 2
3.1.2 INSTALL RAIN GAUGE FUNNEL
Install the rain gauge funnel and rotate clockwise to lock the funnel to the sensor array
Lock
grooves
Step 2
Step 1
3.1.3 INSTALL RECHARGEABLE BATTERIES
Step 1: Unscrew the battery door at bottom of unit and
take out the cable socket.
Step 2: Connect the Ni-MH rechargeable battery plug to
the socket.

Table of Contents

Related product manuals