EN | 61
For the optimum and trouble-free operation of the water dispenser, please
make sure to carry out the works described in the next section according to the
schedule illustrated below.
If increased wear is identied during routine checks, the required intervals
should be shortened in accordance with the actual signs of wear.
Contact customer service with any questions regarding maintenance work and
intervals (see rear page).
Maintenance works to be carried out by the operator
Interval Component Task
Daily Drip tray/ Waste water
container
Empty
Clean
Housing and display Clean
Tap outlet Clean
Twice a year Ventilation grills Clean
Whenever necessary CO
2
bottle Check ll level
Replace
Task Interval
Twice a year
Shut-off and angle valve check
Sanitizing and internal cleaning Twice a year or after a a period of
inactivity of longer than 4 weeks
Safety check Every 2 years
Every 5 years
Check/ descale boiler Twice a year
Maintenance works to be carried out by the
Check the CO
2
bottle Schedule
CO
2
bottle
1. Check whether the shut-off valve B is open. Therefore, it needs to be in a
vertical position, as shown below.
2. If the pressure display on the manometer for the bottle pressure A is indi-
cating the red zone, change the bottle (see ‘Replacing CO
2
gas bottle’ on
page 24).
B
A
MAINTENANCE
60 | EN