BRP-Rotax
MAINTENANCE MANUAL LINE
MAINTENANCE SCHEDULE
Perform the following maintenance tasks at the intervals shown in the maintenance check list.
See Chapter 05-20-00 section 25 hr. check.
Legend: X
=
do the task
blank
=
no task required
NOTE
If the tasks 1-3 are correct continue with the maintenance schedule.
If one of the tasks 1-3 is not fulfilled, the engine must be checked and repaired in accordance with the
BRP-Rotax instructions for continued airworthiness.
Points of Inspection
Interval Operating hours Chapter
Reference
Signa-
ture
* no periodic maintenance (re-
quirement after the first 25 hours
of operation)
25* 50 100 200 400 600 1000
1) General note
All applicable (Alert) Service Bulle-
tins are complied with and
documented.
X X X X X X X
All applicable SI-PAC (Service In-
struction Part and Accessories) for
additional GENUINE-ROTAX®-
parts and accessories used on the
relevant aircraft are complied with
and documented.
X X X X X X X
2) Differential pressure check
Check the compression by the differ-
ential pressure method.
Test pressure________hPa (psi)
Pressure drop (% or fraction)
Cyl.
#
1 2 3 4
bar/
psi
(1
use of leaded fuel (AVGAS) more
than 30% of operation
X
(1
X 12–20–00
Checking
the com-
pression
05–20–00
Page 8
December 01 2023
Effectivity: 916 i A / C24
Edition 0/Rev. 1