BRP-Rotax
MAINTENANCE MANUAL LINE
Points of Inspection
Interval Operating hours Chapter
Reference
Signa-
ture
* no periodic maintenance (re-
quirement after the first 25 hours
of operation)
25* 50 100 200 400 600 1000
11) Checking the turbocharger
Check the wastegate lever for free
running and correct position
X X 12–20–00
Turbocharg-
er
Lubricate the wastegate lever. X X 12–20–00
Turbocharg-
er
12) Checking the propeller gearbox
Check gear set (pittings)
X
See Heavy
Mainte-
nance
Chap.
72–10–00
Check wear on tooth of overload
clutches
X
See Heavy
Mainte-
nance
Chap.
72–10–00
Check overload clutches
X
See Heavy
Mainte-
nance
Chap.
72–10–00
Check wear on the intermediate
shaft
X
See Heavy
Mainte-
nance
Chap.
72–10–00
Change torsion shaft
X
See Heavy
Mainte-
nance
Chap.
72–10–00
13) Checking the cooling system
Inspect the expansion tank for dam-
age and abnormalities. Check cool-
ant level, replenish as necessary.
X X 12–20–00
Expansion
05–20–00
Page 12
December 01 2023
Effectivity: 916 i A / C24
Edition 0/Rev. 1