EasyManua.ls Logo

Bryant 310AAV User Manual

Bryant 310AAV
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation, Start--Up Operating and
Service and Maintenance Instructions
Series E/F
310AAV/JAV
SINGLE--STAGE DELUXE, INDUCED--COMBUSTION
4--WAY MULTIPOISE GAS FURNACE
SAFETY CONSIDERATIONS 2........................
INTRODUCTION 3..................................
CODES AND STANDARDS 4..........................
Safety 4.........................................
General Installation 4...............................
Combustion and Ventilation Air 4.....................
Duct Systems 5...................................
Acoustical Lining and Fibrous Glass Duct 5.............
Gas Piping and Gas Pipe Pressure Testing 5.............
Electrical Connections 5............................
Venting 5........................................
LOCATION 5.......................................
AIR FOR COMBUSTION AND VENTILATION 7.........
INSTALLATION 10..................................
Bottom Return Air Inlet 10..........................
Side Return Air Inlet 10.............................
Leveling Legs (If Desired) 11........................
Bottom Return Air Inlet 12..........................
Suspended Furnace Support 12.......................
Platform Furnace Support 12.........................
Roll--Out Protection 12.............................
Bottom Return Air Inlet 12..........................
Side Return Air Inlet 12.............................
General Requirements 13............................
Ductwork Acoustical Treatment 13....................
Supply Air Connections 13..........................
Return Air Connections 19..........................
115--V Wiring 21..................................
J--box Relocation 21...............................
Electrical Connection to J--Box 21.....................
Power Cord Installation in Furnace J--Box 22............
BX Cable Installation in Furnace J--Box 22..............
24--V Wiring 24...................................
Accessories 24....................................
General Venting Requirements 24.....................
Masonry Chimney Requirements 25...................
Appliance Application Requirements 27................
Sidewall Venting 27................................
START--UP, ADJUSTMENT, AND SAFETY CHECK 32.....
General 32.......................................
Start--Up Procedures 32.............................
Adjustments 37...................................
Check Safety Controls 37...........................
Checklist 38......................................
SERVICE AND MAINTENANCE PROCEDURES 43.......
Introduction 43...................................
Care and Maintenance 44...........................
Sequence of Operation 47...........................
Wiring Diagrams 48...............................
Troubleshooting 48................................
Accessory listing 51
................................
PARTS REPLACEMENT INFORMATION GUIDE 52.......
D
E
S
I
G
N
C
E
R
T
I
F
I
E
D
REGISTERED
ISO 9001:2000
Always Ask For
Use of the AHRI Certified TM Mark indicates a
manufacturers participation in the program. For
verification of certification for individual products,
go to www.ahridirectory.org.
NOTE: Read the entire instruction manual before starting the
installation.
Portions of the text and tables are reprinted from NFPA 54/ANSI
Z223.1--2009E, with permission of Nation Fire Protection
Association, Quincy, MA 02269 and American Gas Association,
Washington DC 20001. This reprinted material is not the
complete and official position of the NFPA or ANSI on the
referenced subject, which is represented only by the standard in
its entirely.

Other manuals for Bryant 310AAV

Questions and Answers:

Bryant 310AAV Specifications

General IconGeneral
Model310AAV
TypeGas Furnace
Efficiency RatingHigh Efficiency
Blower TypeMulti-speed
StagesSingle-stage
Efficiency80% AFUE
AFUE Rating80%
Ignition SystemHot Surface Ignition
Heating Capacity40, 000 to 120, 000 BTU/h
Fuel TypeNatural Gas
Warranty10-Year Parts Limited Warranty upon timely registration
Warranty on Parts10-Year Parts Limited Warranty upon timely registration
Warranty on Heat Exchanger20-year limited warranty

Summary

Safety Considerations

General Safety Warnings and Precautions

Covers all warnings, cautions, and hazards related to installation and operation.

Installation Safety Requirements

Specific safety rules and requirements that must be followed during furnace installation.

Codes and Standards

Compliance with National and Local Codes

Emphasizes adherence to NFGC, NFPA, ANSI, and local building codes.

Electrostatic Discharge (ESD) Precautions

Procedure to prevent damage to electronic components from static discharge.

Air for Combustion and Ventilation

Air Supply Requirements

Details on providing adequate air for combustion, ventilation, and dilution.

Venting System Requirements

Guidelines for proper vent sizing, installation, and chimney requirements.

Installation

Upflow and Downflow Installation Methods

Instructions for upflow and downflow configurations, including return air and leveling legs.

Horizontal Installation and Support Methods

Guidelines for horizontal furnace installation, support methods, and safety features.

Air Duct System Design and Connections

Specifications for designing and installing air duct systems for proper airflow and performance.

Gas Piping and Connections

Procedures and safety warnings for installing and connecting gas piping to the furnace.

Electrical Connections and Wiring

Details for making electrical connections, including J-box relocation and wiring methods.

Start-Up, Adjustment, and Safety Check

Initial Start-Up Procedures

Steps for initial furnace start-up, including wiring, pressure, and door checks.

Burner and Manifold Adjustments

Procedures for setting burner orifice size, manifold pressure, and gas input rate for optimal performance.

Safety Control Verification

Testing and verification of furnace safety controls for proper operation and protection.

Final Operation Checklist

A list of final checks and procedures before leaving the installed furnace.

Service and Maintenance Procedures

General Service Safety Precautions

Essential safety warnings and procedures before performing maintenance or service on the furnace.

Routine Maintenance Schedule

Routine maintenance tasks including filter replacement, motor cleaning, and system inspections.

Heat Exchanger Cleaning

Step-by-step instructions for cleaning the furnace heat exchangers to maintain efficiency.

Troubleshooting Common Issues

Guide to diagnose problems using status codes and troubleshooting flowcharts.

Parts Replacement Information

Component Identification and Parts List

Lists furnace components by group for part identification and ordering.

Model Number and Serial Number Identification

Guidance on locating model/serial numbers for correct part ordering.

Related product manuals