BÜCHI Labortechnik AG Installation | 5
Operation Manual Ultrasonic Package 21/34
u Attach the drying gas hose to the inert gas
adapter
u Attach the inert gas hose to the inert gas
adapter.
u Install the inert gas hose onto the connection
marked OUT.
u Attach the inert gas hose in place with the
union nut.