5 | Installation BÜCHI Labortechnik AG
20/34 Operation Manual Ultrasonic Package
u Attach the assembled feeding tube to the noz-
zle.
u Attach the inlet tube in place with the union
nut.
u Install the feed tube at the peristaltic pump.
See operation manual Mini Spray Dryer
B-290.
u Adjust the peristaltic pump bed. See "Opera-
tion Manual Mini Spray Dryer B-290 "
u Cut the drying gas hose 200 mm below the
heater.
u Attach the hose connector to the inert gas
adapter.
u Attach the inert gas connector to the hose.
u Attach the inert gas adapter in place with a
hose clip.