EasyManua.ls Logo

Buchi V-800 - Vacuum Pump and Valve Unit Setup

Buchi V-800
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
BÜCHI Vacuum Controller V-800/V-805
7.6 Installation with water jet pump B-767
(with integrated cooling water valve)
Screw on water jet pump together with seal to the water
tap. Plug cable to valve socket of the controller.
Connect water jet pump to the rotary evaporator via Woulff
bottle.
Connect cooling water tubing.
7 Putting into operation
Installation with water jet pump B-767 (with integrated cooling water valve)
Installation with vacuum pump and valve unit
7.7 Installation with vacuum pump and valve unit
Connect cable of valve unit with valve socket of the
controller
Connect control cable of the pump with pump socket of
the controller
Connect cable cooling water valve (optional) with CW
socket of the controller
Connect vacuum cover V.Contr. of the valve unit to the
controller
Connect vacuum cover pump of the valve unit to the air
intake fitting of the pump
Connect vacuum cover R1 of the valve unit to the rotary
evaporator

Related product manuals